News

 

 
Dr. Sheikh Hospital activities since 2003
Hospital performance:
  • Equipment and measures taken in the laboratory and radiology:
  • Card device Elisa
  • Providing direct gasometrical system with ability of Ht and Hb
  • Reconstructing & setting up atomizer machine
  • Founding special section for doing sub specialty tests on patients stools
  • Founding separate section for doing sweat test for the first time in Khorasanprovince
  • Purchasing Auto analyzer machine
  • PCR sector commissioning

Radiology:

  • Computerized Radiology
  • Flows copy digital
  • Intervention measures (radiological) (biopsy, drainage)

ICU Section

  • Renovated and air ICU Renovation
  • ICU equipment system for the new ventilator
  • System equipped with a bed neonatal ICU
  • Create new unit EEG
  • Established central oxygen system in ICU
  • The central suction system equipped ICU

Dialysis and nephrology:

  • Cold Water machine-and-development of the section and 6 more patient beds
  • Section added peritoneal dialysis and commissioning with Section Equipment Section
  • Peritoneal dialysis
  • Plasma Freezer

Internal section:

  • Rooms start BM. IT in this section
  • Added chemotherapy unit - Outpatient Department with a computer game machines to equip children
  • Established and equipped game room for children in this section
  • Prepared for bed suite with
  • Painting and wall hanging to suit children age in the section
  • Equipping residents room with the computer system and Internet
  • Equipped rooms with refrigerator - TV - and the closed circuit system
  • Assigned a rest area for personnel
  • Purchased 2 syringe pump units - light rays - blood warmer - Shaker system
  • Purchased stretcher equipped with oxygen
  • Isolated equipment rooms
  • Purchase 2 wavy mattress

Operating room and surgery:

  • Equipped operating room system with advanced cutter
  • Purchased systems monitor
  • Reconstruction and renovation operating room to ventilation system
  • Equipped operating room to the central suction system
  • Purchased 2 new anesthesia units
  • The commissioning dental anesthesia in the operating room
  • Adding a room to the operating room structure and structural changes in the recovery
  • Adding surgical sets
  • Change and modernization equipment and tools
  • Strengthening CSR system in the operating room
  • Open Office Forum cleft palate and harelip
  • Purchased a mobile unit for autoclave operation room
  • Day clinic room and post ICU

Educational and research units and administrative buildings

  • Completion and transfer to Unit Library and equipping educational units
  • Start of Web site unit for promotion and transfer of information Site Map in University Hospital
  • Kitchen renovation and optimization of the hospital and transferred to ground floor
  • Modernization and optimization of hospital waste disposal system
  • Transfer outpatient pharmacy to clinic location to ease the patient's
  • Transfer radiological and laboratory to level 1 - Building and Renovation to the new architecture
  • TV purchased for Radiology - laboratory and waiting room
  • Commissioning Public Relations for personnel convenience
  • Affairs Unit established in the hospital
  • Equipment storage unit ventilation system - computer and new cabinet
  • A permanent festival office
  • 24-hour Section on the second floor
  • Transfer Dental Health Unit to new place

Development Categories

  • PICU Commissioning Section
  • Open forum of nephrology
  • Opening Speech Therapy Clinic
  • Opening of nutrition clinic
  • commissioning dentistry under anesthesia
  • Opening the skin clinic
  • Opening day clinic
  • surgical beds increased from 24 to 50
  • moving section nephrology and radiology and laboratory
  • Design of operating room waiting area
  • Performed in hospital pediatric kidney transplantation
  • permission to increase ICU beds from 10 beds to 16 beds
  • Development Emergency Section

Educational activities

  • Gaining educational points for subspecialty training residents in nephrology departments - pediatrics surgery, and pediatric anesthesia
  • Developing Library
  • Commissioning and equipment development of research unit
  • holding two children Server Festival Scientific Research
  • national workshop cleft lip and palate
  • earn a degree of evaluation Serial for the period of 4 years

IT activities

  • Pacx system for the first time in the hospital in Mashhad University of Medical Sciences
  • development and completion activities HIS
  • complete website hospital
  • office automation system commissioning
  • closed circuit camera system established in the hospital sector and all ICU beds
  • Establishment of Mehr housing cooperatives in the hospital with 130 personnel
Laboratory in Dr. Sheikh Hospital 

 

Laboratory in Dr. Sheikh Hospital

 

Internal in dr. Sheikh Hospital

 

Internal in Dr. Sheikh Hospital

 

Dialysis and nephrology

 

Dialysis and nephrology

 

ICU in Dr. Sheikh Hospital
 
 
ICU in Dr. Sheikh Hospital

Last Update : 2010-03-15 16:15:26

Address: Dr. Sheikh Hospital -Tohid Square, Motahari Avenue, Mashhad, Iran Telephone No.: (098 511)7269021-5 Fax No.: (098 511)7277470 Email: sheikh-hos@mums.ac.ir